Extensions in Upper Eastern Green
Most extensions are decided long before anyone digs: how deep you can go without a planning application, what is in the ground, and where the daylight will come from once the back wall moves.
- Local to Upper Eastern Green
- Fully insured
- Free fixed quotes

Property Maintenance Coventry builds home extensions in Upper Eastern Green: single-storey rear, side return, wrap-around and two-storey. Groundworks and foundations, structural steel to engineer calculations, roof, glazing and full fit-out, with Building Control involved throughout. Survey first, then a fixed written quote and a programme.
Working in Upper Eastern Green
Upper Eastern Green is the northern part of Eastern Green, west of the city in the CV5 postcode district, near the Allesley and Mount Nod boundaries.
It is mostly post-war and later housing, so the common jobs are roofline replacement, flat-roof extensions and garages reaching the end of their life, and driveways that were laid before the surfacing rules changed.
Eastern Green, Lower Eastern Green and Mount Nod are all covered too.
- Eastern Green Junior School
- Eastern Green Recreation Ground
- Woodlands Academy
- A rear extension of 4m detached or 3m semi/terraced is generally permitted development, subject to conditions.
- A quote with no written specification cannot be compared with another one.
- A lawful development certificate is the document that answers a buyer's solicitor years later.
- Removing the existing rear wall on a beam is what turns an extension into one room rather than two.
- Previous extensions count against your allowance, so what the house has already had matters.
The work itself, in plain terms
The extension work we take on across Upper Eastern Green (CV5), from a single-storey rear to a full two-storey build.
Single storey rear extensions
Rear extensions from foundations to finished room, with the light to the existing house designed in rather than lost.
Two storey extensions
Two-storey extensions, cheaper per square metre because foundations and roof are shared, though more likely to need planning.
Side returns & side extensions
Side returns and side extensions — modest in area, substantial in how the ground floor actually works.
Planning & Building Control
We establish early whether the project is permitted development or needs an application, and build the approvals into the programme.
Groundworks & structure
Groundworks and structural work, including the trial holes and trees check that set foundation depth honestly.
Full fit-out
Everything after the shell: services, finishes and the snagging done before we call it complete.
Built around how you own the property
Growing families
More usable space without changing schools, neighbours or the commute.
Open-plan projects
Taking out the back wall on a designed beam, so the new space and the old become one room.
Investors
Specification chosen for durability and resale rather than for personal taste.
The jobs that start with a phone call
- 01
Sockets in the wrong places, because the kitchen layout was decided after first fix.
- 02
An extension started with no contingency, where the first surprise in the ground forced a visible compromise.
- 03
A design drawn to the permitted development limit without checking what a previous owner already added.
- 04
A flat roof with inadequate fall, ponding within a year of being finished.
- 05
A kitchen-diner planned with no structural allowance for taking the existing rear wall out.
- 06
An extension that leaves the original back room dark, because all the glazing went in the new rear wall.
What we check on a property in Upper Eastern Green
Every quote starts with a survey. These are the things we look at on extension work in Upper Eastern Green, and why each one changes the recommendation.
Protecting the rest of the house
We plan dust screens, floor protection and the route in and out before starting. Living through a build is tolerable if the mess is contained to where the work is.
The existing structure being opened into
What carries the wall you are opening up, and what sits above it, determines the steel and the propping. We establish this before quoting, not when the plaster comes off.
Contingency and what could move the price
We say plainly which parts of the quote are firm and which depend on what we find — usually foundations and the existing structure — so the contingency is a planned figure rather than a shock.
Building Control route and inspection points
We establish which body is inspecting and when they need to attend. Inspections built into the programme never delay a job; inspections remembered late always do.
Access for plant and materials
Whether a digger can reach the back garden, where a skip can stand and how far materials must be barrowed changes both method and price. Restricted access is workable but it has to be priced honestly.
Existing foundations
Where the new structure ties into the old, we need to know what the existing foundations are. Trial holes are sometimes the only honest way to find out.
Simple, transparent, no pressure
Free inspection & advice
We visit, assess the job properly and explain your options in plain English — no pressure.
Transparent fixed quote
A clear, line-by-line quote with no hidden costs. You decide in your own time.
Expert workmanship
Our qualified, insured team completes the work on time, on budget and to a high standard.
Walkthrough & tidy finish
We clean up fully and don't leave until you're 100% happy.
Trusted across Coventry
Extensions in Upper Eastern Green — your questions answered
Still have a question? Our local team is happy to help — no pressure, no jargon.
Speak to us today0786 5778332Have you worked around Eastern Green Junior School?
Eastern Green Junior School is in the part of Upper Eastern Green we cover, and extension work there is routine for us. Every quote still starts with a survey of the actual property, because no two are the same even on one street.
Is Upper Eastern Green in your coverage?
It is. Upper Eastern Green sits in the CV5 district and we work there regularly. Give us the full postcode when you call and we can be specific about survey dates.
What about insulation and energy efficiency?
New extensions have to meet current Building Regulations for thermal performance, which is considerably better than most existing housing. The practical consequence is worth knowing: a well-insulated extension attached to a poorly insulated house can make the older rooms feel colder by comparison, and heating systems sized for the original house may need reassessing. Worth thinking about at design stage rather than discovering in the first winter.
What is a lawful development certificate and should I get one?
It is a formal confirmation from the council that your project is permitted development and did not need planning permission. It is optional, but it is cheap relative to the build and it is the document a buyer's solicitor will ask for years later. Without it you are relying on your own reading of the rules to satisfy a future conveyancer, which is an awkward position to be in at the point of sale.
Can we stay living in the house during the work?
For most single-storey rear extensions, yes, with real disruption at particular points — principally when the opening is made between old and new, when services are moved, and during any floor work. Where a kitchen is being extended into, a temporary kitchen is worth planning for. We sequence work to keep the house usable and tell you honestly which weeks will be the difficult ones.
Will an extension add value?
Usually, though rarely pound for pound, and the ceiling is the top of the market for your street. Adding a bedroom or opening up a cramped ground floor tends to do better than simply adding area. Overdeveloping relative to the neighbours is the way to spend money you will not get back. We would rather say that at survey than after you have committed.
How do you handle changes once work has started?
Priced and agreed in writing before they are built. Changes are normal — seeing the space makes people reconsider — but they cost more the later they come, and a change after first fix can mean undoing finished work. We will always tell you what a change costs and what it does to the programme before doing it, not afterwards.
Get your free extensions quote in Upper Eastern Green
Tell us what you are hoping to add and roughly where on the house. We will come and look at the plot, the drains and the access, and tell you what is realistic before anyone pays for drawings.
- No obligation, no pressure, no hidden costs
- Qualified, insured Coventry tradespeople
- Fast response — within 24 hours on urgent jobs
